Phedikhola Hydropower Company Limited has announced its AGM going to be held on 30th Shrawan, 2082.

Introduction

Phedikhola Hydropower Company Limited (PHCL) incorporated on November 23, 2016. It is promoted by individual promoters having experience in setting up hydropower projects. PHCPL is setting up a 4.3 MW run-of-river, Phedi Khola (Thumlung) Small Hydropower Project (PKSHP) in Salpasilicho VDC, Bhojpur district, Province 01. The project will be constructed under BOOT (Build, own, Operate and Transfer) mechanism.

Objectives

Brighten the nation by maximum utilization of water resources and bring prosperity to people through hydropower development.

About Us

Phedikhola Hydropower Co. Ltd. is run-off-river project with an installed capacity of 4.3 MW located at Phedi Thumlung River.

News

Installed capacity of the Phedi Khola (Thumlung) Small Hydropower Project is 4.30 MW. This ROR scheme comprises of about 25 m long diversion weir with full reservoir level at 1120.00 masl will divert the design discharge towards the intake at right bank of the river.

Contact Us

We are located in Buddhanagar, Kathmandu.

Profile

Proposed headworks site of Phedi Khola (Thumlung) Small Hydropower Project lies at an elevation of 1120 masl. Catchment area of Phedi Khola at the intake site is 58.26 km2. The powerhouse site of Phedi Khola (Thumlung) Small Hydropower Project at an elevation of about 940 masl. Design discharge of the project at 40% exceedance flow is 2.91 m3/s. Design of the diversion weir and the headworks has been carried out considering 200 years return period flood discharge of 281.38 m3/s.

Survey Licensing Related

- Phedi Khola Hydropower Company Ltd. registered in Government of Nepal.
- Issuance of license for 4.3 MW capacities.

Interconnection & Power Purchase Agreement (PPA) Related

- Process on Confirmation of interconnection point at Sitalpati substation.
- New Connection agreement will be signed with NEA Grid Department.
- PPA has been completed.