Phedikhola Hydropower Company Limited (PHCL) incorporated on November 23, 2016. It is promoted by individual promoters having experience in setting up hydropower projects. PHCPL is setting up a 4.3 MW run-of-river, Phedi Khola (Thumlung) Small Hydropower Project (PKSHP) in Salpasilicho VDC, Bhojpur district, Province 01. The project will be constructed under BOOT (Build, own, Operate and Transfer) mechanism.
Brighten the nation by maximum utilization of water resources and bring prosperity to people through hydropower development.
Phedikhola Hydropower Co. Ltd. is run-off-river project with an installed capacity of 4.3 MW located at Phedi Thumlung River.
Installed capacity of the Phedi Khola (Thumlung) Small Hydropower Project is 4.30 MW. This ROR scheme comprises of about 25 m long diversion weir with full reservoir level at 1120.00 masl will divert the design discharge towards the intake at right bank of the river.
We are located in Buddhanagar, Kathmandu.
Proposed headworks site of Phedi Khola (Thumlung) Small Hydropower Project lies at an elevation of 1120 masl. Catchment area of Phedi Khola at the intake site is 58.26 km2. The powerhouse site of Phedi Khola (Thumlung) Small Hydropower Project at an elevation of about 940 masl. Design discharge of the project at 40% exceedance flow is 2.91 m3/s. Design of the diversion weir and the headworks has been carried out considering 200 years return period flood discharge of 281.38 m3/s.
- Phedi Khola Hydropower Company Ltd. registered in Government of Nepal.
- Issuance of license for 4.3 MW capacities.
- Process on Confirmation of interconnection point at Sitalpati substation.
- New Connection agreement will be signed with NEA Grid Department.
- PPA has been completed.